Item |
Date |
|
Repaired |
| 1 |
Cracks in Spreader Brackets |
April 2011 |
| 2 |
Remove speaker wire from bilge |
April 2011 |
| 3 |
Loose wires in A/C cabinet |
April 2011 |
| 4 |
Gel coat repair Starb. Hull |
April 2011 |
| 5 |
Touch up bottom paint |
April 2011 |
| 6 |
Remove Loran |
April 2011 |
| 7 |
Floor loose at cabin table |
April 2011 |
| 8 |
Clean, dry, inspect bilge |
April 2011 |
| 9 |
Install screens on dorad inlets |
April 2011 |
| 10 |
Install screen on anchor locker door |
April 2011 |
| 11 |
Bimini straps badly frayed |
April 2011 |
| 12 |
Seal Screw holes in Sump Tank |
April 2011 |
| 13 |
2 Fwd screws on teak walkway leaking |
April 2011 |
| 14 |
Lights in head inop |
April 2011 |
| 15 |
Several teak slats loose on aft cockpit seat |
April 2011 |
| 16 |
Ignition switch loose in panel |
April 2011 |
| 17 |
Install screens on hatches |
May-2011 |
| 18 |
Sump Tank switch missing |
May-2011 |
| 19 |
All deck fittings need new "O" rings |
May-2011 |
| 20 |
Lazy Jack bracket has sheared screw |
May-2011 |
| 21 |
Helm needs refinished |
May-2011 |
| 22 |
Sump Pump impeller needs replaced |
May-2011 |
| 23 |
Install non-skid on steps |
May-2011 |
| 24 |
Install GFI outlet in galley |
May-2011 |
| 25 |
No Main Sail |
May-2011 |
| 26 |
Cap line in holding tank |
May-2011 |
| 27 |
Salon table lights inop / broken / wires disconnected |
May-2011 |
| 28 |
Install track in Mast |
May-2011 |
| 29 |
Replace inner forestay halyard |
May-2011 |
| 30 |
Remove / Replace Nav chair |
May-2011 |
| 31 |
Re-stitch Bimini |
May-2011 |
| 32 |
Port / Aft Corner of hatch needs repaired |
May-2011 |
| 33 |
Install new cap in holding tank flush fitting (anchor locker) |
May-2011 |
| 34 |
Head door hinges need repaired |
May-2011 |
| 35 |
Sump pump shorted |
May-2011 |
| 36 |
Roller furler line needs replaced |
May-2011 |
| 37 |
Replace 2 halyards |
June-2011 |
| 38 |
Add 2 mast head halyards |
June-2011 |
| 39 |
Top of jib torn at luff cord |
June-2011 |
| 40 |
Water line at water heater needs replaced |
June-2011 |
| 41 |
Water line Check valves need replaced |
June-2011 |
| 42 |
Sump float switch needs raised |
June-2011 |
| 43 |
Install interior LEDs |
June-2011 |
| 44 |
LPG Bottles need replaced |
June-2011 |
| 45 |
Build companionway screen |
June-2011 |
| 46 |
Replaced ignition and pre-heat switch with new |
June-2011 |
| 47 |
Forward Cleat Starb side loose |
June-2011 |
| 48 |
Make mail sail cover |
June-2011 |
| 49 |
New mattress for V-berth |
June-2011 |
| 50 |
Light in head needs replaced |
June-2011 |
| 51 |
Polish Plexiglas ports |
June-2011 |
| 52 |
Companionway trim needs repair clean & Paint |
June-2011 |
| 53 |
Rebed Starb Center Bimini mount |
July-2011 |
| 54 |
Salon hatch leaking - needs re-bedded |
July-2011 |
| 55 |
Make foredeck and cabin boom tents |
July-2011 |
| 56 |
Reseal toe rail edge to deck |
July-2011 |
| 57 |
Sand and oil dorade boxes |
July-2011 |
| 58 |
Rebed port bow cleat |
July-2011 |
| 59 |
Rebed port fowd lifeline stantion |
July-2011 |
| 60 |
Lazerett aft hinge loose |
July-2011 |
| 61 |
Sand and oil toe rail |
July-2011 |
| 62 |
Gally foot pump faucet leaking |
July-2011 |
| 63 |
Alt belt or water pump squealing |
July-2011 |
| 64 |
Two open hoses in engine compartment / use? |
July-2011 |
| 65 |
Secondary Fuel filter missing nut |
July-2011 |
| 66 |
Swim Ladder brackets loose and missing nuts |
July-2011 |
| 67 |
Stbd winch cleat leaking at mount bolts |
July-2011 |
| 68 |
Replace broken interior trim at mast |
July-2011 |
| 69 |
Redo cockpit aft storage area / remove radio |
July-2011 |
| 70 |
V-Berth hatch leaking / port latch? |
July-2011 |
| 71 |
Sand and refinish trim at fwd hatch & companionway interior |
July-2011 |
| 72 |
Head door top frame piece needs secured |
July-2011 |
| 73 |
Sand and oil hand rails |
July-2011 |
| 74 |
A/C control head intermit |
July-2011 |
| 75 |
Forward hatch gasket leaking / replace all hatch gaskets |
August-2011 |
| 76 |
Replace engine covers sound dampning |
August-2011 |
| 77 |
Sound deaden 'fridge compressor |
Sept-2011 |
| 78 |
Install storage box under aft hatch and fixt hatch hinge |
Sept-2011 |
| 79 |
Toppinig lift broken |
Sept-2011 |
| 80 |
Installed Lavac Head / installed new waste water lines |
Oct-2011 |
| 81 |
Replaced floor under head with 1/2' Corian |
Oct-2011 |
| 82 |
Plumb in deck wash fitting / port side |
Oct-2011 |
| 83 |
Remove and replace engine mounts |
Nov-2011 |
| 84 |
Sheared stud in aft / starb engine mount |
Nov-2011 |
| 85 |
Aft Cabin hatches - inside trim needs sand and stain |
Nov-2011 |
| 86 |
Re-stitch Bimini |
Dec-2011 |
| 87 |
Build storage / seat box for nav station |
Feb-2012 |
| 88 |
Assemble and install hatches (4) |
Feb-2012 |
| 89 |
Fwd Comapnionway trim split and rotting |
Mar-2012 |
| 90 |
Installed hinge on 'fridge lid |
Mar-2012 |
| 91 |
Fab & Install spash guard in galley |
Mar-2012 |
| 92 |
Build and install spice rack for aft galley wall |
Mar-2012 |
| 93 |
Build and install sliding cutting board / counter for stove top |
Mar-2012 |
| 94 |
Water lines need replaced |
April-2012 |
| 95 |
Install light bar over sink |
Mar-2012 |
| 96 |
Replace fan in V-berth |
Mar-2012 |
| 97 |
Replace fan in aft cabin |
Mar-2012 |
| 98 |
Replace manifold for hot water system |
Mar-2012 |
| 99 |
Paint aft hatch frame |
May-2012 |
| 100 |
Repair muffler |
June-2012 |
| 101 |
Install light bar over fridge |
July-2012 |
| 102 |
Construct dodger |
Aug-2012 |
| 103 |
Install new sink drain |
Oct-2012 |
| 104 |
Replace windlass gypsy |
Dec-2012 |
| 105 |
Replace salon cushions with new |
Jan-2013 |
| 106 |
Build bulkhead table to replace existing dining table |
April-2013 |
| 107 |
Repair shaft coupler to transmission |
May-2013 |
| 108 |
Complete 8 month replacement of V-drive and Transmission |
June-2013 |
| 109 |
Construct tool room/workshop |
July-2013 |
| 110 |
Install new propeller |
Aug-2013 |
| 111 |
Install holding tank monitor |
Aug-2013 |
| 112 |
Install new Mantus anchor |
Aug-2013 |
| 113 |
Repair mast weld |
Aug-2013 |
| 114 |
Repair smile crack |
Aug-2013 |
| 115 |
Sand paint blisters off |
Aug-2013 |
| 116 |
Paint bottom |
Aug-2013 |
| 117 |
Build shelves in Tim's closet |
Aug-2013 |
| 118 |
Begin Cape Horn installation |
Aug-2013 |
| 119 |
Repair rudder tube |
Sept-2013 |
| 120 |
Repair rudder |
Sept-2013 |
| 121 |
Install inline water filters |
Sept-2013 |
| 122 |
Install drinking water filter/faucet |
Sept-2013 |
| 123 |
Repair rudder shoe |
Sept-2013 |
| 124 |
Repair fuel injection pump |
Nov-2013 |
| 125 |
Replace glow plug relay |
Nov-2013 |
| 126 |
Rebed galley sink |
Nov-2013 |
| 127 |
Rig preventer |
Jan-2014 |
| 128 |
Repair and rebed traveler |
Aug-2014 |
| 129 |
Repair and rebed aft cabin port |
Aug-2014 |
| 130 |
Repair large soft spot in forward deck |
Aug-2014 |
| 131 |
Add staysail roller furling |
Aug-2014 |
| 132 |
Replace oven thermostat |
Sept-2014 |
| 133 |
Rebuild heat exchanger |
Sept-2014 |
| 134 |
Install solar panels |
Jan-2015 |
| 135 |
Repair dinghy leak |
Jan-2015 |
| 136 |
Build phone rack |
Feb-2015 |
| 137 |
Finish aft cabin sun lights |
Feb-2015 |
| 138 |
Rebuild winches |
May-2015 |
| 139 |
Replumb galley sink drain |
May-2015 |
| 140 |
Rebed forward cleats |
May-2015 |
| 141 |
Add charging plug to V-berth |
July-2015 |
| 142 |
Repair improperly installed alternator bracket |
July-2015 |
| 143 |
Paint bottom |
July-2015 |
| 144 |
Install autopilot for wind vane |
July-2015 |
| 145 |
Install inverter |
July-2015 |
| 146 |
Install propane sniffer |
July-2015 |
| 147 |
Install LED strip lights in salon |
July-2015 |
| 148 |
Recover pillows and sew slip covers |
July-2015 |
| 149 |
Convert pilot berth to shelving |
July-2015 |
| 150 |
Recover nav seat |
July-2015 |
| 151 |
Replace raw water pump with new |
July-2015 |
| 152 |
Change exhaust clamps |
July-2015 |
| 153 |
Re-skin bimini |
Aug-2015 |
| 154 |
Rebuild solar panel mounts |
Aug-2015 |
| 155 |
Add new solar panel |
Aug-2015 |
| 156 |
Design and construct connector between bimini and dodger |
Aug-2015 |
| 157 |
Add chafe protection to edges of dodger |
Aug-2015 |
| 158 |
Replace improperly installed bow chock |
Aug-2015 |
| 159 |
Service windlass |
Aug-2015 |
| 160 |
Refinish cabin floor |
|
| 161 |
Repaint non-skid on deck. |
|
| 162 |
Repaint non-skid in aft cabin |
|
| 163 |
Add remote oil change system |
|
| 164 |
Add LED strip lights in aft cabin |
|
| 165 |
Replace anchor chain |
|
| 166 |
Sew enclosure |
|
| 167 |
Install overboard plumbing |
|